Nepal's national fast-charging network
Every highway,
always charged.
AGILE designs, builds, and operates the charging stations connecting Kathmandu to Pokhara, the Terai to the hills — so range is never the reason you stayed home.
OUR SOFTWARE PARTNER
The products
The products
Every site is engineered for its context — a driveway, a depot, or a highway rest stop — and all of them speak the same protocol.
Loading products...
How a site gets built
From survey to switch-on, in five stages.
STAGE 01 — 1–2 WEEKS
Site & grid survey
Our engineers assess grid capacity, footfall, and driver demand before a single cable is ordered.
STAGE 02 — 2–3 WEEKS
Permitting & utility upgrade
We handle municipal approvals and coordinate any transformer or feeder upgrades with the utility.
STAGE 03 — 3–5 DAYS
Civil works & installation
Foundation, conduit, and charger mounting — completed with minimal disruption to the site.
STAGE 04 — 1 DAY
Commissioning & testing
Load testing, safety certification, and network onboarding before the station goes live.
STAGE 05 — ONGOING
24/7 monitoring & care
Remote diagnostics and a local technician network keep uptime above 99% for the life of the site.
Why operators choose AGILE
Infrastructure that just works.
Smart charging app
Reserve a bay, track your session, and pay — all from one app with live station status.
Solar-hybrid sites
Select stations blend rooftop solar with grid power, cutting cost and downtime during outages.
Safety certified
Every station meets IEC 61851 charging standards and undergoes independent electrical audits.
24/7 local support
A technician network across Nepal responds to any station within four hours, day or night.
Recent projects
On the ground, across Nepal.
Loading projects...
Client stories
Trusted by the operators who can't afford downtime.
Loading testimonials...